Skip to main content

NEWP Phase 4 – 25kV Electrification Upgrade Works

Client:
Power Systems
Sector:
Renewable Energy – Onshore Wind
Voltage Range:
33Kv
Services Provided:
Cable jointing, terminations, testing, QA Documentation
Client:
Network Rail – North East West Programme (NEWP) Phase 4
Sector:
National Rail / Traction Electrification / Overhead Line Electrification (OLE)
Voltage Range:
25kV single-phase AC
Services Provided:
High-voltage cable jointing, 3M straight joints and terminations, on-track and substation installation works, interface support.

Project Overview

As part of Network Rail’s wider North East West Programme (NEWP) Phase 4 electrification works, ADY-HV was appointed to deliver critical jointing and termination support for the 25kV single-phase traction network. Our scope included the supply, preparation, and installation of 3M straight joints and terminations, delivered both in trackside environments and within substation compounds.
This phase of NEWP focused on expanding electrified routes in the North of England, improving operational efficiency, capacity and sustainability of regional passenger and freight lines. ADY-HV’s experienced team delivered all works in accordance with railway electrical standards, ensuring safe, robust, and long-term performance of the newly installed HV infrastructure.

Scope of Works

  • Installation of 25kV straight joints and terminations using 3M-approved kits.
  • Jointing activities delivered both on-trackside routes and within traction substations.
  • Full cable preparation, stripping, alignment and phasing validation prior to assembly.
  • Interface coordination with Network Rail OLE teams and substation contractors.
  • Adherence to installation tolerances, torque settings, and shrink profiles to ensure reliability and performance.
  • Contribution to energisation readiness through installation QA and visual inspection support.

Talk to Us

  • Delivering safe, compliant and technically robust high-voltage jointing across Network Rail programmes nationwide, ADY-HV is your trusted partner for traction power upgrades and AC electrification works.
  • Get in touch: Let us support your 25kV project with proven expertise and rail-compliant delivery.